Short Lead Time for Ore Processing Furnace - Mechanical Machine Pump Spares Water Pump Casing – Special Metal

Short Description:

The pump casing we offer can meet the followings:  1.  Tolerance size of the casting shall conform to ISO8026-3 DCTG 13-RMA 6(RMAG H)-GCTG 7-DS  2.  Cracks, burnt, sand and slag inclusions are not allowed. On the unhandled surfaces should not be defects reducing the strength, performance and degrade casting presentation. Allowed correction of welding, in which defective cutting may be performed by the manufacturer’s instruction. Locations of these defects in the casting and the butcheri...


Product Detail

Product Tags

Related Video

Feedback (2)

To create much more price for clients is our company philosophy; purchaser growing is our working chase for Rolling Mill Chocks , Castings Rinding Table , Smelting Pot , We are very proud of the good reputation from our customers for our products' reliable quality.
Short Lead Time for Ore Processing Furnace - Mechanical Machine Pump Spares Water Pump Casing – Special Metal Detail:

The pump casing we offer can meet the followings: 

1.  Tolerance size of the casting shall conform to ISO8026-3 DCTG 13-RMA 6(RMAG H)-GCTG 7-DS 

2.  Cracks, burnt, sand and slag inclusions are not allowed. On the unhandled surfaces should not be defects reducing the strength, performance and degrade casting presentation. Allowed correction of welding, in which defective cutting may be performed by the manufacturer’s instruction. Locations of these defects in the casting and the butchering size under welding must be registered and entered in the casting documents. After removal of butchering defects, the surface should be grinded and monitored for completeness remove defects by dye penetration 

3. Carry out UT of the castings: the end surfaces along the entire length in the area of the flange connector of the pump housing and cover (zone 1) in the area of the suction flange connector (zone2),in the area of the discharge flange connector (zone3), permitted without correcting defects of the equivalent size to 5mm not more than 3pcs.

4. The conformity checking with the chemical composition of the steels should be carried out from the each melt.

The chemical composition of castings:

Mass fraction of component %    

C

Mn

Si

  P S

No more than

0.22-0.30 0.45-0.9 0.2-0.52 0.05 0.05


5. The steel mechanical properties: Tensile strength not less 441MPa, elongation Q not less 19%, impact strength not less 392KJ/m2, hardness HB 121-151. The mechanical properties of the steel are necessary to control for each melt. Test results apply to all the castings from this melt, heat-treated in the same mode, record by automatic devices.

Production Process  

1. Wooden pattern Production  

2. Molding

3. Pouring

4. First cleaning

5. Heat treatment – grinding (inspection)

6. Rough machining (inspection)-finishing machining (inspection)

7. Packing-delivering

Quality assurance

The fabrication route is governed by the provisions of the implemented Quality System ISO 9001: 2000. The standard documentation ensures the full traceability of every process step:

• Manufacturer test certificates according to DIN EN 10.204 § 3.1 including chemical composition, mechanical properties and non-destructive examination;

• Dimensional check supported with a “as-built“ sketch;

• Record of the heat treatment chart


Product detail pictures:

Short Lead Time for Ore Processing Furnace -
 Mechanical Machine  Pump Spares  Water Pump Casing – Special Metal detail pictures

Short Lead Time for Ore Processing Furnace -
 Mechanical Machine  Pump Spares  Water Pump Casing – Special Metal detail pictures

Short Lead Time for Ore Processing Furnace -
 Mechanical Machine  Pump Spares  Water Pump Casing – Special Metal detail pictures

Short Lead Time for Ore Processing Furnace -
 Mechanical Machine  Pump Spares  Water Pump Casing – Special Metal detail pictures

Short Lead Time for Ore Processing Furnace -
 Mechanical Machine  Pump Spares  Water Pump Casing – Special Metal detail pictures


Related Product Guide:
PCB Carolina 2018 Show Floor Sold Out, Biggest Ever | Slag Pots
Waterbury Metals Factory Spills More Than 1,000 Gallons Of Oil Into Naugatuck River | Lead Ingot Mold

We are committed to providing easy,time-saving and money-saving one-stop purchasing service of consumer for Short Lead Time for Ore Processing Furnace - Mechanical Machine Pump Spares Water Pump Casing – Special Metal, The product will supply to all over the world, such as: Philadelphia , Venezuela , Angola , Our company offers the full range from pre-sales to after-sales service, from product development to audit the use of maintenance, based on strong technical strength, superior product performance, reasonable prices and perfect service, we will continue to develop, to provide the high-quality products and services, and promote lasting cooperation with our customers, common development and create a better future.
  • We are a small company that has just started, but we get the company leader's attention and gave us a lot of help. Hope we can make progress together!
    5 Stars By Debby from Frankfurt - 2016.10.25 15:53
    This supplier's raw material quality is stable and reliable, has always been in accordance with the requirements of our company to provide the goods that quality meet our requirements.
    5 Stars By Stephanie from Birmingham - 2016.11.29 11:09
    Agree with this Privacy Policy.
    
    WhatsApp Online Chat !